Peterborough Main page

Pages on Main Line steam at Peterborough

Railways around Peterborough and The National Rail Network & Heritage railways in the UK
ukrailways1970tilltoday.me.uk
Peterborough  Railways
Platform 7 in 2018 ( page 2 of 2 )
Home Page
Next Page is on the Goods Avoiding line in 2018.
railway videos page
UK National railway
This Page is about platform 7 in 2018 at Peterborough railway station
Peterborough
Heritage Railways
Platform 7 in 2018.
 
Platform 7 at Peterborough Wednesday 28th of Febuary 2018
 
GBRf class 66731
 
GBRf class 66731 in platform 7 on the 28th of February 2018
 
 
Freighliner class 66564
 
Freighliner class 66564 using platform 7 at Peterborough station on Wednesday 28th of Febuary 2018 .
 
The poster on the side of the locomotive says "We're Recruiting!".
 
Platform 7
 
Platform 7 is an all new platform that had only opened in 2014. It has been built along side the goods avoiding line and is part of an island platform with platform 6. Both these platforms have no overhead wires and will be used for services like the Liverpool and the Stanstead to Brmingham trains that run mostly on non-wired lines.
 
One of the main plus points is that this platform and all the others at Peterborough station now have lifts. There is a waiting room and WCs
 
Freight from the March line also also uses this platform.
 
Next Page is on the Goods Avoiding line in 2018.
 
Top of This Page  Home Page
 
Peterborough Main page     Pages on Main Line steam at Peterborough
 
 
At long last Peterborough railway station has some, New platforms. These were needed for when it all goes pear shape, there are just not enough platforms to go round. Even with all going well trains often had to wait for a platform on the river Nene railway bridge.
      On Tuesday 13th December 2011 Network Rail announced a 43 million pound upgrade of Peterborough railway station starting in April 2012 and to be completed by December 2013. ( There was still ongoing work  in Feruary 214 and it was to be April 2014 be for it was all done)
This work has now increased the numer of platforms to 7 and includes new lifts to each platform. There were no lifts to any platform at Peterborough be for.
      The New Layout at Peterborough station has seen: The old bay (platform1) removed. Platform 2 renumber as platform 1 and made longer. Platform 3 renumbered as platform 2 and also made longer. The all New Platform 3 is next to the up fast line, built on waste land. Platform 4 and 5 remain as they were, but hve been made a little longer. Platform 6 and 7 are an all new Island platform.  A new goods avioding line has also been built along side platform 7.
Most platforms are signaled both ways with new signals on some platforms.
Map of the old layout at Peterborough on the left and the the New layout  on the right.     Yellow for new Platforms
 
Page updated 6/3/2018
 

 

This website is Ukrailways1970tilltoday.me.uk it is a web site on railways, but it is not just on trains, but all things railways, with photos, which I have taken from the 1970s till now. I take photos of all things railways, steam diesel and electric trains, signal boxes, wagons any thing that is on the National Rail network, which was BR when I started taken photos.
 
All photos on this site are taken by me unless named otherwise.