Peterborough Main page

Pages on Main Line steam at Peterborough

Railways around Peterborough and The National Rail Network & Heritage railways in the UK
ukrailways1970tilltoday.me.uk
Peterborough  Railways
Werrington in 2015 ( page 2 of 2 )
Home Page
Next Page is on platform 1 at Peterborough in 2014
Next Page is on platform 1 at Peterborough in 2016     This platform was number 2 be for the station was altered
railway videos page

UK National railway

  Peterborough

 Heritage Railways

 
Werrington in 2015
 
This part of The East Coast Main Line at Werrington is just to the north of Peterborough but still part of Peterborough.
 
This page is at the footbrige across the ECML near to the Peterborough Post Office sorting office. The line to Stamford runs a long side the ECML here.  Werrington junction were the the Line to Spalding and Sleaford leaves the ECML is just to north of this footbrige.
 
Virgin East Coast HST 43299
 
Virgin East Coast HST 43299 on the down fast at Werrington on the 14-4-2015
 
Virgin East Coast DVT 82208
 
Virgin East Coast DVT 82208 on the up fast at Werrington on the 14-4-2015
 
East Midlands trains HST
 
East Midlands trains HST with power car 43064 on the down fast at Werrington on the 14th April 2015 .This high Speed Train set was on Hire to East Coast.
 
 Virgin class 91106 on the down slow
 
Virgin East Coast class 91106 on the down slow (Stamford line) on the 14th of April 2015.
 
The down line to Stamford is wired from Peterborough to Helpston crossing, and acts as the ECML down slow be for it re-joins the ECML at Helpston level crossing.
 
A lot of the freight north of Peterborough is from 2015 going to use the Great Northern loop by way of Spalding and the now reopened Sleaford avoiding line to Lincoln and Doncaster. This line has been upgraded with all the old signal boxes removed or closed and old gated level crossings upgraded .
 
East Midland Trains Class 153326
 
East Midland Trains Class 153326 on a Linclon Train on the 8th of April on the Splalding line at Werrington.
 
 
 
 
 
 
 
 
 
Top of This Page
 
Next Page is on platform 1 at Peterborough in 2014
 
Next Page is on platform 1 at Peterborough in 2016     This platform was number 2 be for the station was altered
 
 
 
 
 
 
 
 
 
Some of the platforms
numbers changed in 2014
In June 2014 Network Rail had announced that they were considering whether to build a flyover or a tunnel under the East Coast Main Line at Werrington Junction. This is one of many plans, that Network Rail were considering in 2014. Will it ever gets built, we will have to wait and see..

Next Page is on platform 1 at Peterborough in 2014   Next Page is on platform 1 at Peterborough in 2016     This platform was number 2 be for the station was altered

   Top of This Page     Home Page

Peterborough Main page  Pages on Main Line steam at Peterborough
 
Page updated 21/9/2018

This website is Ukrailways1970tilltoday.me.uk  it is on railways, but it is not just on trains, but all things railways, with photos, which I have taken from the 1970s till now. I take photos of all things railways, steam diesel and electric trains, signal boxes, wagons any thing that is on the National Rail network, which was BR when I started taken photos.