Werrington in 2021 A15 Bridge and
the Old Lincoln Road bridge
Diversion on 20th November 2021
Down LNER Azuma coming under the A15 dual carriage road bridge with dive dive under on the right with a diversion off the ECML onto the Spalding line and by way of Lincoln to Doncaster on the 20th November 2021 .
Up LNER Azuma on a diversion on the 20th November 2021
The dive under is not yet in use on left .
Grand Central class 180 coming under the A15 dual carriage road bridge with dive under on the right heading north.
Freightliner class 66504 coming under the A15 dual carriage road bridge with dive under on the right heading north.
The old Lincoln road A15 was replaced with a new A15 dual carriage road bridge in 1970s or 80s and a cycle way and footbridge use the old bridge. this was made longer to let the new dive under tracks go under.
Werrington Junction
At Werrington Junction the Line to Spalding and Sleaford leaves the ECML.
In June 2014 Network Rail announced that they were considering whether to build a flyover or a under pass, under the East Coast Main Line at Werrington Junction.
Network Rail has said in 2018 that it is to build a dive under called 'The Werrington Grade Separation' from the Stamford line under the ECML to the Spalding line(GNR loop).
The Great Northern Loop line to Spalding and to Lincoln and Doncaster is now used by freight after being done up with all the signal boxes replaced by a signal center at Lincoln soon to be replace by theYork signal center.