Railways around Peterborough & The National Rail Network & Heritage railways in the UK
video page
Home Page
Next page
Full page list of Mainline station pages on this site
Peterborough Railways
2020's
Werrington in 2020
Full page list of Heritage Railways pages on this site
Werrington in 2020
 Hurn Road Footbridge
 
 Two class 56s on ECML up slow at the Hurn road Footbridge
 
Two class 56s on ECML up slow at the Hurn road Footbridge in 10 January in 2020
 
 GBRF class 66746
 
GBRF class 66746 on Stamford line on 10th January 2020
 
 Cross Country class 170 on the new up Stamford line on the 10th of January 2020
 
Cross Country class 170 on the new up Stamford line on the 10th of January 2020 heading to Peterborough round the site for the new dive under.
 
The old track was were the 3 men are standing. Some of the old track is still stacked waiting to be removed
 
LNER class 91119 in British Rail Intercity colours
 
LNER class 91119 in British Rail Intercity colours on the ECML down fast at Hurn Road footbridge on the 15th of May 2020.
 
 
 LNER Azuma on the ECML down fast
 
 LNER Azuma on the ECML down fast at Hurn Road footbridge on the 15th of May in 2020
 
 LNER Azuma on the ECML up fast
 
 LNER Azuma on the ECML up fast at Hurn Road footbridge on the 13th of July in  2020
 
This part of The East Coast Main Line at Werrington is just to the north of Peterborough and there were water troughs here in steam days on the ECML. The line to Stamford runs a long side the East Coast Main Line (ECML) here.
 
This down line to Stamford is wired from Peterborough to Helpston crossing, and is also acts as the ECML down slow befor re-joining the ECML at Helpston
 
The level crossing here on Hurn Road between Marholm and Werrington was closed and replaced by a very tall footbridge from which I took these photos from..
 
Werrington Junction
 
At Werrington Junction the Line to Spalding and Sleaford leaves the ECML.
 
In June 2014 Network Rail announced that they were considering whether to build a flyover or a under pass, under the East Coast Main Line at Werrington Junction.
 
Network Rail had said in 2018 that it is to build a dive under called 'The Werrington Grade Separation' from the Stamford line under the ECML to the Spalding line(GNR loop).
 
              Top of This Page   Next page
 
 

 
 
Top of This Page  Next page     
 
Home Page    Signal Box Page
 
Full page list of Mainline station pages on this site
Full page list of Heritage Railways pages on this site
 
Full page list of railway line  between Leicester and Peterbough
 
Page updated 10/2/2024