www.ukrailways1970tilltoday.me.uk
Railways around Peterborough & The National Rail Network & Heritage railways in the UK
video page
Home Page
Next page is on Hurn road Werrington in 2019
Full page list of Mainline station pages on this site
Peterborough Railways
2014- 2020
Werrington in 2019 (4)
Full page list of Heritage Railways pages on this site
2014 till 2019 pages
2000 to 2013 pages
1970 till 1999 pages
 
 
 
Cock Lane Footbridge Werrington in 2019 page 4
 The new footbridge At Werrington
being built in October and November 2019
 
Part of the new footbridge at Werrington on the 9th in October  2019
 
The new footbridge at Werrington on the 9th in October  2019 with just the main span in place.
 
Part of the old footbridge is a waiting to be removed at Werrington on the 9th in October  2019
 
Part of the old footbridge is a waiting to be removed at Werrington on the 9th in October  2019 with the new one having just the main span in place showing were the is being built.
 
The new footbridge at Werrington on the 23rd October  2019
 
The new footbridge at Werrington on the 23rd October  2019 showing the ramps being put in place.
 
The new footbridge at Werrington on the 27th October  2019
 
The new footbridge at Werrington on the 27th October  2019 showing the steps this side have been put in place. There are still some of the panels missings.
 
The new footbridge at Werrington on the 6th of November  2019
 
The new footbridge at Werrington on the 6th of November  2019 showing the steps this side have now been put in place. There is one  of the panels still missings in this photo. The bridge is still closed.
 
 
Some of the new track has been laid on the 4th of December 2019
 
Some of the new track has been laid on the 4th of December 2019
 
 
This part of The East Coast Main Line at Werrington is just to the north of Peterborough The line to Stamford runs a long side the East Coast Main Line (ECML) here.
 
This down line to Stamford is wired from Peterborough to Helpston crossing, and is also acts as the ECML down slow befor re-joining the ECML at Helpston.Werrington Junction
 
At Werrington Junction the Line to Spalding and Sleaford leaves the ECML.
 
In June 2014 Network Rail announced that they were considering whether to build a flyover or a under pass, under the East Coast Main Line at Werrington Junction.
 
Network Rail has said in 2018 that was to build a dive under called 'The Werrington Grade Separation' from the Stamford line under the ECML to the Spalding line(GNR loop).
 
The Great Northern Loop line to Spalding and to Lincoln and Doncaster is now used by freight after being done up with all the signal boxes replaced by a signal center at Lincoln.
 
Top of This Page   Next page is on Hurn road Werrington in 2019
 
 
 
 
Top of This Page   Next page is on Hurn road Werrington in 2019
 
Home Page    Signal Box Page
 
Full page list of Mainline station pages on this site
Full page list of Heritage Railways pages on this site
 
 
Full page list of railway line  between Leicester and Peterbough
 
Page updated 10/2/2024