Werrington in 2019 (1)
Stamford line Hurn Road Footbridge
Azuma on test on down slow on the Stamford line 14th January 2019
GBRf class 66758 on the 14th January 2019
DB class 66069 on the 14th January 2019
LNER Class 91114 on the Down slow (Stamford line) on the 23rd of October 2019
GBRf Class 66721 with Harry Beck's Tube Map on the Stamford line on the 23rd October 2019
GBRf class 66707 on the 13th May 2019
This part of The East Coast Main Line at Werrington is just to the north of Peterborough and there were water troughs here in steam days on the ECML. The line to Stamford runs a long side the East Coast Main Line (ECML) here.
This down line to Stamford is wired from Peterborough to Helpston crossing, and is also acts as the ECML down slow befor re-joining the ECML at Helpston
The level crossing here on Hurn Road between Marholm and Werrington was closed and replaced by a very tall footbridge from which I took these photos from..
Werrington Junction
At Werrington Junction the Line to Spalding and Sleaford leaves the ECML.
In June 2014 Network Rail announced that they were considering whether to build a flyover or a under pass, under the East Coast Main Line at Werrington Junction.
Network Rail had said in 2018 that it is to build a dive under called 'The Werrington Grade Separation' from the Stamford line under the ECML to the Spalding line(GNR loop).