Peterborough Main page

Pages on Main Line steam at Peterborough

Railways around Peterborough and The National Rail Network & Heritage railways in the UK
ukrailways1970tilltoday.me.uk
Peterborough  Railways
Platform 3 in 2018 ( page 1 of 2 )
Home Page
Next Page is page two on the up Fast in 2018.
railway videos page

UK National railway

This Page is about the new (2014) platform 3 in 2018 at Peterborough railway station
Peterborough

Heritage Railways

Platform 3 in 2018
 
Virgin East Coast DVT 82223
 
Virgin East Coast DVT 82223 about to stop with London Kings Cross train in platform 3 with Virgin East Coast HST power car 43206 at the rear of an up train in platform 4 on the 16th of January 2018
 
DB class 90 034
 
DB class 90 034 at the rear of an up train in platform 3 at Peterborough on the 30th of January 2018
 
Virgin East Coast HST  power car 43313
 
Virgin East Coast HST  power car 43313 on the up fast ,just about to  come into platform 3 on the 30th of January 2018
 
DB class 90 039
 
DB class 90 039 at the rear of an up Virgin East Coast train  to London Kings Cross in platform 3 at Peterborough on Saturday the 17th of February 2018
 
This Page is about the new Platform 3. This platform was made along what is still the up fast line
 
Platform 3 was, and still is, the up fast so trains are doing about 100 miles a hour, so keep well behind the yellow lines!
 
This platform was part of the upgrade at Peterborough railway station. New lifts were added to this new platform. There was a small strip of waste land between the old platform 3 and the up fast line were a new platform face was built making it into an island platform  This new platform face is now platform number 3.
 
Next Page is page two on the up Fast in 2018.
 
Top of This Page  Home Page

Peterborough Main page  Pages on Main Line steam at Peterborough

Some of the platforms numbers changed in 2014
 
At long last Peterborough railway station has some, New platforms. These were needed for when it all goes pear shape, there are just not enough platforms to go round. Even with all going well trains often had to wait for a platform on the river Nene railway bridge.
      On Tuesday 13th December 2011 Network Rail announced a 43 million pound upgrade of Peterborough railway station starting in April 2012 and to be completed by December 2013. ( There was still ongoing work  in Feruary 214 and it was to be April 2014 be for it was all done)
This work has now increased the numer of platforms to 7 and includes new lifts to each platform. There were no lifts to any platform at Peterborough be for.
      The New Layout at Peterborough station has seen: The old bay (platform1) removed. Platform 2 renumber as platform 1 and made longer. Platform 3 renumbered as platform 2 and also made longer. The all New Platform 3 is next to the up fast line, built on waste land. Platform 4 and 5 remain as they were, but hve been made a little longer. Platform 6 and 7 are an all new Island platform.  A new goods avioding line has also been built along side platform 7.
Most platforms are signaled both ways with new signals on some platforms.
Map of the old layout at Peterborough on the left and the the New layout  on the right.     Yellow for new Platforms
 
Page updated 3/3/2018
 

 

This website is Ukrailways1970tilltoday.me.uk it is a webe site on railways, but it is not just on trains, but all things railways, with photos, which I have taken from the 1970s till now. I take photos of all things railways, steam diesel and electric trains, signal boxes, wagons any thing that is on the National Rail network, which was BR when I started taken photos.
 
All photos on this site are taken by me unless named otherwise.